[[attachment:nep-status-2017.png|{{attachment:nep-status-2017.png|attachment:nep-status-2017.png|width="600"}}]] [[attachment:surveystatus2020Jan.png|{{attachment:surveystatys2020Jan.png|attachment:surveystatus2020Jan.png|width="600"}}]]
Line 3: Line 3:
The completion rate at the end of the year 2017 is 6%. (From Hyunjong's slide) As of Jan 2020, M17BL007 is 50% complete in terms of observing time.

[ATTACH]

As of Jan 2020, M17BL007 is 50% complete in terms of observing time.